一份計量体制調查/稽核

 关闭 [复制链接]
umec 发表于 2008-7-19 09:26:35 | 显示全部楼层 |阅读模式
一份計量体制調查/稽核,有興趣的朋友可以試試...(以下是部份內容,總的在附樑中)
3)Are gauges and test / inspection equipment, including customer owned gauges and equipment, maintained and adequately stored? (including National standard calibration or traceability)
1 – Deficient
No system for maintainence/storage

2 – Marginal
No tracking with general access; regular maintainence

3 – Acceptable
Documented tracking with general access; regular maintainence

4 – Preferred
Documented tracking with controlled access; regular maintainence

5 - World Class
Automated tracking with controlled access; recurring maintainence


4)Are gauges and test / inspection equipment, including customer owned gauges and equipment, checked by a documented system with a defined GR&R system and are records maintained? Are they identified as to: (a) Item identity / Serial No. (b) Date calibrated
1 – Deficient
No system or > 2 deviations

2 – Marginal
Documented system; < 2 deviations

3 – Acceptable
Documented system; no deviations

4 – Preferred
Documented system; no deviations

5 - World Class
Automated system; no deviations


5)Are calibration settings and adjustments safeguarded to prevent unauthorized adjustments/modifications?
1 – Deficient
No system

2 – Marginal
Documented system; unprotected settings

3 – Acceptable
Documented system; password protected settings

4 – Preferred
Documented system; remote protected settings

5 - World Class
Automated system maintains setting integrity


6)Are controls in place to assure actions are taken in the event of calibration failure?
1 – Deficient
No system

2 – Marginal
Documented system with no sign-off

3 – Acceptable
Documented system with general sign-off

4 – Preferred
Documented system with QA sign-off

5 - World Class
Automated system forces response flow


7)Is the maintenance by a systematic preventative maintenance system?
1 – Deficient
No system or audits

2 – Marginal
Documented system with periodic audits

3 – Acceptable
Documented system with individual group responsibility

4 – Preferred
Documented system with dedicated group responsibility

5 - World Class
Automated system


10) Are all new tools registered in the calibration/maintenance system before release to production?
1 – Deficient
No system or audits

2 – Marginal
Documented system with periodic audits

3 – Acceptable
Documented system with individual group responsibility

4 – Preferred
Documented system with dedicated group responsibility

5 - World Class
Automated system linking production and calibration systems


11)Are quarantine/deviation procedures in place for out of calibration or maintenance equipment?
1 – Deficient
No system

2 – Marginal
Documented system with no machine level lockout; lot level deviation tracking

3 – Acceptable
Documented system with machine level lockout; lot level deviation tracking

4 – Preferred
Documented system with machine level lockout; unit level deviation tracking

5 - World Class
Automated system with production lockout/deviation


12)Is a time based or cycle based system implemented to track calibration/maintenance?
1 – Deficient
No system

2 – Marginal
na

3 – Acceptable
Documented system tracks time or cycle

4 – Preferred
Documented system tracks time and cycle

5 - World Class
Automated system tracks time and cycle


13)Is each piece of equipment characterized to determine its performance baseline?
1 – Deficient
No equipment characterized

2 – Marginal
Some equipment characterized

3 – Acceptable
Critical equipment characterized

4 – Preferred
All equipment characterized

5 - World Class
All equipment characterized and matched


14)Is Mean Time Between Failures (MTBF)/Mean Time To Repair (MTTR) calculated for each piece of equipment at the system, subsystem and major components levels?
1 – Deficient
No system or monitoring

2 – Marginal
Documented system with periodic monitoring

3 – Acceptable
Documented system with individual group tracking

4 – Preferred
Documented system with dedicated group tracking

5 - World Class
Automated system tracking


15)Are statistical methods used to evaluate maintenance frequencies?
1 – Deficient
No system or monitoring

2 – Marginal
Documented system with periodic audits

3 – Acceptable
Documented system with individual groups monitoring maintainence frequencies

4 – Preferred
Documented system with dedicated group monitoring maintainence frequencies

5 - World Class
Automated system adjusts maintainence frequencies


16)Has repair spare parts usage been analyzed, and are spare parts stocked accordingly?
1 – Deficient
No system or monitoring

2 – Marginal
Documented system with recurring restocking

3 – Acceptable
Documented system with individual groups monitoring spares

4 – Preferred
Documented system with dedicated group monitoring spares

5 - World Class
Automated system monitoring with link to purchasing systems

調查.rar

4.35 KB, 下载次数: 18, 下载积分: 金币 -1

计量单位 发表于 2008-7-19 16:52:03 | 显示全部楼层

回复 1# 的帖子

请问:有无中文版的?发上来让我们参考学习.谢谢!
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|Archiver|计量论坛 ( 闽ICP备06005787号-1—304所 )
电话:0592-5613810 QQ:473647 微信:gfjlbbs闽公网安备 35020602000072号

GMT+8, 2025-6-21 00:49

Powered by Discuz! X3.4

Copyright © 2001-2023, Tencent Cloud.

快速回复 返回顶部 返回列表